Summary for Test 2022-03-30-11-2
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 215108 DEA: 07337604 EFIS: 0717000036 |
---|---|
DIST-CO-RTE-PM | 07-LA-14-R28.9/R29.2 |
Award Date | 10/15/2020 |
Closeout Date | 05/04/2023 |
Work Description | REPLACE EXISTING STORM DRAIN, AND CONSTRUCT A COLLECTION SYSTEM. |
Location Description | LOS ANGELES COUNTY IN AND NEAR SANTA CLARITA FROM 0.8 MILE NORTH OF PLACERITA CANYON ROAD UNDERCROSSING TO 0.5 MILE SOUTH OF GOLDEN VALLEY ROAD OVERCROSSING |
QA Service Level | 1 (Verified on 02/24/2021) |
Sample Information
Sample Taken Date | 03/30/2022 | Sample Unique Key | 11 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/04/2022 |
Sample type | Per Request | A brief description of the sample | PG Asphalt Binder |
The quantity of what the sample constitutes | 1 Quart Can | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Honesto | Last name of sampler or witnessed by | Castillo |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0200-22 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | AAA-Irwindale | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-10 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2022-03-30-11
DIME Test ID: 2022-03-30-11-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2022-04-11
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sm Ali
Date of test: 04/07/2022
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 167.917 grams
Mass of empty container #2: 172.983 grams
Mass of container #1 before test (m1i): 202.62 grams
Mass of container #2 before test (m2i): 207.827 grams
Mass of container #1 after test (m1f): 202.595 grams
Mass of container #2 after test (m2f): 207.797 grams
Average mass change: -0.079 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/11/2022 ✔