Summary for Test 2022-03-22-9-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 993241
DEA: 101F7604
EFIS: 1017000024
DIST-CO-RTE-PM10-SJ-12-R4.4
Award Date11/05/2021
Closeout Date05/10/2023
Work DescriptionREPLACE BRIDGE BEARING PADS.
Location DescriptionSAN JOAQUIN COUNTY IN TERMINOUS AT LITTLE POTATO SLOUGH BRIDGE
QA Service Level1 (Verified on 09/27/2021)

Sample Information

Sample Taken Date03/22/2022 Sample Unique Key9
Date that the sample was received by the laboratory/organization performing the testing03/24/2022 Sample typeQuality Assurance
A brief description of the sampleBearing Pad The quantity of what the sample constitutes1
From where was the sample collectedManufacturer First name of sampler or witnessed byBrad
Last name of sampler or witnessed byStreeter Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameScougal Rubber
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)21330-1
Material/Compound/Elastomer IDna Samples Representing15
Description (size)4.03"x14"x18" Comments
Description (Number of Shims)7 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Scougal Rubber
Batch Numberna

Test Details

DIME Sample ID: 2022-03-22-9
DIME Test ID: 2022-03-22-9-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2022-03-30

Test Results


Input Type: Measured
Tester's full name: Rachael Chavez
Date of test: 03/30/2022
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/30/2022 ✔