Summary for Test 2022-02-02-48-1
Test performed: AASHTO T27-14Project Information
| Project Identifiers | Project ID: 66667 DEA: JMFPP EFIS: 0019000043 |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for submitting Sample information for JMF Prequalification Program. |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 02/02/2022 | Sample Unique Key | 48 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/10/2022 |
| Sample type | Verification | A brief description of the sample | JMF PP 1/2" HMA-A-SP R25 0.25% EVO |
| The quantity of what the sample constitutes | 4 Bags Combined Agg., 2 Bags Rap | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | RJ Noble | Last name of sampler or witnessed by | QC |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 0157A-22 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | RJ Noble-Orange | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0035::EAGLE VALLEY QUARRY |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | 40R2508SPWEO | A detailed description of where the material sample was collected | Belt Cut at RJ Noble Orange Plant |
| Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 1/2 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2022-02-02-48
DIME Test ID: 2022-02-02-48-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2022-03-29
Test Results
What type of gradation is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Does this test use 1/4 sieve? (question for HMA Gradation Type): No
Has the fine aggregate sample been reduced?: No
Input Type: Calculated
Tester's full name: Satish Jain/Friday Ofoegbu
Date of test: 03/12/2022
| Cumulative Percent Passing | ||||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 97 % | ||||||
| 83 % | ||||||
| 51 % | ||||||
| 32 % | ||||||
| 21 % | ||||||
| 14 % | ||||||
| 9 % | ||||||
| 7 % | ||||||
| 4.9 % | ||||||
General comments (publicly viewable) (Max 1000 characters): Combined Virgin Aggregate Gradation
Test was verified on 3/29/2022 ✔
