Summary for Test 2022-03-16-2-2
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 214663 DEA: 081F7304 EFIS: 0815000034 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-215-2.7 |
| Award Date | 03/04/2021 |
| Closeout Date | 06/03/2025 |
| Work Description | REPLACE CONCRETE BRIDGE, PLACE CONCRETE PCPS GIRDERS AND HMA. |
| Location Description | SAN BERNARDINO COUNTY IN COLTON AT WASHINGTON STREET OVERCROSSING |
| QA Service Level | 1 (Verified on 02/24/2021) |
Sample Information
| Sample Taken Date | 03/16/2022 | Sample Unique Key | 2 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 03/21/2022 | Sample type | Quality Assurance |
| A brief description of the sample | #7 Rebar | The quantity of what the sample constitutes | 4 samples from Lot # 1 |
| From where was the sample collected | Fabricator | First name of sampler or witnessed by | Lorenzo |
| Last name of sampler or witnessed by | Garcia | Title of sampler | |
| Telephone number of sampler | 17029172503 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Integrity Rebar Placers | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | L115-025-22 | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A615 |
| Material Grade | 60 | Rebar Manufacturer | CMC |
| Coupler Manufacturer | Bar Splice Products | Intermediate Assembler or Fabricator | |
| Rebar Size | #7 | Coupler Model | Double Barrel Zap Screwlok |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 0344 | Rebar Heat Number(s) | 65033264 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2022-03-16-2
DIME Test ID: 2022-03-16-2-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2022-03-24
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 03/22/2022
UTM: 400kip
Temperature: 72 f
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|
| 1 | 2 | 1 | 7/22mm | 0.6 | 56093.35 | 93489 | Service Splice | bewing |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point FileTest graph for the Sample
Test was verified on 3/24/2022 ✔
