Summary for Test 2022-03-08-10-6
Test performed: CTM TEMP1-16Project Information
| Project Identifiers | Project ID: 215188 DEA: 080F5434 EFIS: 0817000239 Permit Numbers: 0823NMC0369 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-I-15,SR-91-6.1-7.6 |
| Award Date | 03/11/2020 |
| Closeout Date | 06/05/2024 |
| Work Description | I-15 ELC: 15/91 Express Lanes Connector Project (ELC) |
| Location Description | Junction of I-15 and SR-91 in Corona, CA |
| QA Service Level | 1 (Verified on 09/16/2020) |
Sample Information
| Sample Taken Date | 03/08/2022 | Sample Unique Key | 10 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/09/2022 |
| Sample type | Quality Control | A brief description of the sample | PCC |
| The quantity of what the sample constitutes | One girder | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Roberto | Last name of sampler or witnessed by | Reyes |
| Title of sampler | QC Technician | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Con-Fab California, LLC | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | SR 91 Temescale Wash OH | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | SCC-S98-0F |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 2271 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Back of the concrete truck | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-03-08-10
DIME Test ID: 2022-03-08-10-6
Testing Lab: Con-Fab California, LLC
Test Method: CTM TEMP1-16: Test Method for Monitoring Precast Concrete Curing Temperature (Curing temperature)
Test Release Date: 2022-03-11
Test Results
Input Type: Calculated
Tester's full name: Roberto Reyes Perez
Date of test: 03/08/2022
Precast Maximum Curing Temperature: 135.5 °F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/11/2022 ✔
