Summary for Test 2021-06-21-69-1

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 212245
DEA: 024F8604
EFIS: 0213000043
DIST-CO-RTE-PM02-TRI-36-26.7/27.1
Award Date11/02/2018
Closeout Date05/23/2022
Work DescriptionROADWAY REALIGNMENT AND NEW BRIDGE CONSTRUCTION
Location DescriptionTRINITY COUNTY ABOUT 9 MILES EAST OF FOREST GLEN FROM 0.6 MILE WEST TO 0.1 MILE WEST OF ROUTE 3
QA Service Level1 (Verified on 03/21/2017)

Sample Information

Sample Taken Date06/21/2021 Sample Unique Key69
Date that the sample was received by the laboratory/organization performing the testing06/21/2021 Sample typeDepartment Acceptance
A brief description of the sample1 bag of combined RAP (3/8-inch) for use in 3/4-inch Type A HMA The quantity of what the sample constitutesProduction Start-Up Evaluation
From where was the sample collectedManufacturer First name of sampler or witnessed byUnknown
Last name of sampler or witnessed byUnknown Title of sampler
Telephone number of sampler Laboratory sample identificationD78851B
Linked DIME Sample ID The fabricator/manufacturer/facility nameJF Shea Construction - Fawndale Rock and Asphalt - Redding, CA
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceFawndale Rock and Asphalt, Redding, CA
Aggregate Size3/8-inch Aggregate Source
RAP Stockpile Stockpile Size (tons)
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2021-06-21-69
DIME Test ID: 2021-06-21-69-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2022-01-25

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Measured
Tester's full name: Terry McCormick
Date of test: 06/23/2021
Test procedure used?: Method A
Mass of the specimen basket assembly: no data
Mass of the specimen and specimen basket assembly prior to ignition: no data
Mass of HMA Sample prior to ignition: 1648.6 g
Mass Loss: no data
Mass of aggregate remaining after ignition: 1542.8 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: no data
Test Temperature: 1000 F
Corrected Asphalt Binder Content: 6.42 %
General comments (publicly viewable) (Max 1000 characters): Pbr ≈ 5.67%

Test was verified on 1/25/2022 ✔