Summary for Test 2021-10-27-40-1

Test performed: CTM 302-April 2014

Project Information

Project IdentifiersProject ID: 215360
DEA: 112N0454
EFIS: 1118000198
DIST-CO-RTE-PM11-SD-94-30.0/39.0
Award Date02/18/2021
Closeout Date08/02/2022
Work DescriptionPLACING CHIP SEAL, SLURRY SEAL, SHOULDER BACKING AND STRIPING.
Location DescriptionSAN DIEGO COUNTY NEAR DULZURA AND BARRETT JUNCTION FROM 0.9 MILE EAST OF GRANDE CREEK BRIDGE TO ROUTE 188.
QA Service Level1 (Verified on 02/08/2021)

Sample Information

Sample Taken Date10/27/2021 Sample Unique Key40
Date that the sample was received by the laboratory/organization performing the testing11/26/2021 Sample typeQuality Control
A brief description of the sampleAggregates The quantity of what the sample constitutes2 bags
From where was the sample collectedSource First name of sampler or witnessed byNot Provided
Last name of sampler or witnessed byNot Provided Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCCA
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeNot Applicable
HMA Grading1/2 inch Lot number
Sublot number HMA Mix NumberNot set
Binder content (%)Not set Virgin binder PGNot set
Design binder PGNot set Binder SupplierNot set
RAP content (%)Not set WMA AdditivesNot set
Antistrip typeNot set

Test Details

DIME Sample ID: 2021-10-27-40
DIME Test ID: 2021-10-27-40-1
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 302-April 2014: Method of Test for Stripping
Test Release Date: 2022-01-13

Test Results


Using: Paving Grades of Asphalt
Input Type: Calculated
Tester's full name: Melchor Oronoz
Date of test: 01/14/2022
Asphalt Quantify: 60.10 g
General comments (publicly viewable) (Max 1000 characters): 1/2" Chip Aggregates

Test was verified on 1/13/2022 ✔