Summary for Test 2022-01-12-7-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 214524 DEA: 07304504 EFIS: 0714000067 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-57-R0.0/R4.5 |
| Award Date | 06/11/2020 |
| Closeout Date | 04/03/2025 |
| Work Description | CONCRETE PAVEMENT, CONCRETE BARRIER, AND ELECTRICAL WORK. |
| Location Description | LOS ANGELES COUNTY IN DIAMOND BAR AND CITY OF INDUSTRY FROM ORANGE COUNTY LINE TO ROUTE 57/60 SEPARATION |
| QA Service Level | 1 (Verified on 08/12/2020) |
Sample Information
| Sample Taken Date | 01/12/2022 | Sample Unique Key | 7 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/12/2022 |
| Sample type | Department Acceptance | A brief description of the sample | Native Soils |
| The quantity of what the sample constitutes | 28 CY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Jacinto | Last name of sampler or witnessed by | Villanueva |
| Title of sampler | TEC | Telephone number of sampler | 8182096574 |
| Laboratory sample identification | 22-0051 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Griffith Construction | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Native Soil |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | From Various Location | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2022-01-12-7
DIME Test ID: 2022-01-12-7-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-01-12
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Jacinto Villanueva
Date of test: 01/12/2022
Gage No.: 31105
Test No.: 2
Nuclear By: Jacinto Villanueva
Non-Bias Plan No.: 5
Depth: 12
Material No.: on site
Material Type: Native
Impact By: Jacinto Villanueva
Standard Count Density: 2249 g/cc
Count or Density 1: 2 g/cc
Count or Density 2: 1.88 g/cc
Count or Density 3: 1.97 g/cc
Standard Count Moisture: 594 g/cc
Moisture Count 1: 0.29 g/cc
Moisture Count 2: 0.34 g/cc
Moisture Count 3: 0.37 g/cc
Sum of Count or Density: 5.85 g/cc
Average of Count or Density: 1.95 g/cc
Sum of Moisture Count: 1 g/cc
Average of Moisture Count: 0.33 g/cc
Calculated Percent Relative Compaction: 96.1 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters): Sta 315+0.9 to Sta 316+36 AVSF Location #2 West Wall Beyond 2.0 feet from the wall.
Test was verified on 1/12/2022 ✔
