Summary for Test 2022-01-05-3-2

Test performed: CTM 216-June 2011

Project Information

Project IdentifiersProject ID: 214573
DEA: 073096U4
EFIS: 0719000091
DIST-CO-RTE-PM07-LA-210-R0.0/R9.7
Award Date04/03/2020
Closeout Date06/06/2024
Work DescriptionPLACE CONCRETE PAVEMENT, BARRIER, HMA, DRAINAGE, AND ELECTRICAL.
Location DescriptionLOS ANGELES COUNTY IN LOS ANGELES FROM INTERSTATE 5 TO WHEATLAND AVENUE UNDERCROSSING
QA Service Level1 (Verified on 06/05/2020)

Sample Information

Sample Taken Date01/05/2022 Sample Unique Key3
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/05/2022
Sample typeDepartment Acceptance A brief description of the sampleClass 3 Aggregate Base
The quantity of what the sample constitutes162CY From where was the sample collectedJob Site
First name of sampler or witnessed byJacinto Last name of sampler or witnessed byVillanueva
Title of samplerTEC Telephone number of sampler8182096574
Laboratory sample identification22-0022 Linked DIME Sample ID
The fabricator/manufacturer/facility nameGriffith Construction Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleClass 3 Aggregate Base
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedFrom various locations at Aggregate Base
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2022-01-05-3
DIME Test ID: 2022-01-05-3-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2022-01-12

Test Results


Is oversize material: No
Input Type: Measured
Tester's full name: Jacinto Villanueva
Date of test: 01/05/2022
In-place wet density: 2.26
Highest adjust wet density: 2.33
% Moisture: no data
Optimum Moisture: no data
Relative compaction: 97
General comments (publicly viewable) (Max 1000 characters): Sta 203+50 to Sta 208+70 Width 24.0 feet aggregate base Lane 2&3

Test was verified on 1/12/2022