Summary for Test 2021-09-27-71-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 215744 DEA: 033H93U4 EFIS: 0321000091 |
|---|---|
| DIST-CO-RTE-PM | 03-YUB,BUT-70-25.5/25.8,0.0/3.8 |
| Award Date | 07/15/2021 |
| Closeout Date | 07/15/2025 |
| Work Description | WIDEN ROADWAY & SHOULDER, ADD TURN LANES & CONSTRUCT BRIDGE. |
| Location Description | YUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD |
| QA Service Level | 1 (Verified on 05/20/2021) |
Sample Information
| Sample Taken Date | 09/27/2021 | Sample Unique Key | 71 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/28/2021 |
| Sample type | Verification | A brief description of the sample | 1/2" Rap |
| The quantity of what the sample constitutes | bags of rap | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Kenny | Last name of sampler or witnessed by | McHugh |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Teichert Aggregates | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Teichert Aggregates |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2021-09-27-71
DIME Test ID: 2021-09-27-71-2
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2021-12-27
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Julian Gonzales
Date of test: 09/29/2021
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 5.20 %
General comments (publicly viewable) (Max 1000 characters): JMF21-039
Test was verified on 12/27/2021 ✔
