Summary for Test 2021-12-10-6-3
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 214951 DEA: 120K0234 EFIS: 1214000100 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-17.1/18.9 |
Award Date | 09/23/2020 |
Closeout Date | Not set |
Work Description | South County Improvement Project (Phase 3 - El Toro/Alicia) WIDEN FREEWAY AND BRIDGES, RECONSTRUCT BRIDGE AND WALLS. |
Location Description | ORANGE COUNTY IN MISSION VIEJO, LAGUNA HILLS, LAGUNA WOODS AND LAKE FOREST FROM 0.4 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING TO 0.2 MILE NORTH OF EL TORO ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 10/01/2020) |
Sample Information
Sample Taken Date | 12/10/2021 | Sample Unique Key | 6 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/15/2021 |
Sample type | Quality Assurance | A brief description of the sample | Barsplice Zap Screwlok Coupler |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Kim | Last name of sampler or witnessed by | Young |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | BarSplice | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Nucor |
Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | |
Rebar Size | #9 | Coupler Model | Zap Screwlok |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | 4000000772 | Rebar Heat Number(s) | 1202034576 |
Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2021-12-10-6
DIME Test ID: 2021-12-10-6-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2021-12-16
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: spaine
Date of test: 12/16/2021
UTM: 400kip
Temperature: 72.00 f
Halo ID:
Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|---|
1 | 3 | No. 9/29mm | 1 | 0 | 1 | 91879 | 91879 | ok necking | spaine |
General comments (publicly viewable) (Max 1000 characters): ok necking
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 12/16/2021 ✔