Summary for Test 2019-08-15-20-2

Test performed: CTM 204-June 2010

Project Information

Project IdentifiersProject ID: 213469
DEA: 024C40V4
EFIS: 0218000125
DIST-CO-RTE-PM02-SHA-5-R3.8/R11.7
Award Date11/06/2018
Closeout Date08/16/2023
Work DescriptionWIDEN TO 6 LANES, BRIDGE REPLACEMENT AND WIDENING AND ROADWAY REHAB
Location DescriptionSHASTA COUNTY IN AND NEAR ANDERSON FROM ROUTE 5/273 SEPARATION TO 0.4 MILE SOUTH OF CHURN CREEK ROAD OVERCROSSING
QA Service Level1 (Verified on 12/31/2018)

Sample Information

Sample Taken Date08/15/2019 Sample Unique Key20
Date that the sample was received by the laboratory/organization performing the testing08/15/2019 Sample typeVerification
A brief description of the sampleCombined Untreated 3/4-inch Type G Aggregate The quantity of what the sample constitutesJMF Verification
From where was the sample collectedSource First name of sampler or witnessed byMark
Last name of sampler or witnessed byMahoney Title of samplerConsultant
Telephone number of sampler Laboratory sample identificationD78105F
Linked DIME Sample ID The fabricator/manufacturer/facility nameJF Shea Construction - Fawndale Rock Quarry - Redding
Transportation Laboratory (TL) Number898330 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-45-0017
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedLaboratory Batched from Sized Untreated Stockpile Samples
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design numberJMF 19-26-S1 Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2019-08-15-20
DIME Test ID: 2019-08-15-20-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 204-June 2010: Method of Test for Liquid Limit, Plastic Limit and Plasticity Index of Soils (Plasticity Index)
Test Release Date: 2021-12-14

Test Results


The test method used?: Plastic Index
Input Type: Measured
Tester's full name: Terry McCormick
Date of test: 08/28/2019
Liquid Limit (LL): 0 %
Plastic Limit (PL): 0 %
Plastic Index(PI): NP
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/14/2021 ✔