Summary for Test 2021-11-08-28-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 215631
DEA: 074W5004
EFIS: 0718000348
DIST-CO-RTE-PM07-LA,VEN-1,23,34,101,118,126-VAR
Award Date05/27/2021
Closeout Date08/25/2022
Work DescriptionDECK REPAIR, CLEAN EXPANSION JOINTS, REPLACE JOINT SEAL.
Location DescriptionVENTURA AND LOS ANGELES COUNTIES AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 08/17/2021)

Sample Information

Sample Taken Date11/08/2021 Sample Unique Key28
Date that the sample was received by the laboratory/organization performing the testing11/16/2021 Sample typeQuality Assurance
A brief description of the samplebearing pad The quantity of what the sample constitutes1
From where was the sample collectedManufacturer First name of sampler or witnessed byBrad
Last name of sampler or witnessed byStreeter Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameScougal Rubber
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)20480-4
Material/Compound/Elastomer IDna Samples Representing2
Description (size)4.03"x12"x8" Comments
Description (Number of Shims)7 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Scougal Rubber
Batch Numberna

Test Details

DIME Sample ID: 2021-11-08-28
DIME Test ID: 2021-11-08-28-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2021-11-18

Test Results


Input Type: Measured
Tester's full name: Rachael Chavez
Date of test: 11/18/2021
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/18/2021 ✔