Summary for Test 2015-12-09-2-1

Test performed: CTM 213-December 2012

Project Information

Project IdentifiersProject ID: 208852
DEA: 040A5344
EFIS: 0400021131
COOP: 042491
DIST-CO-RTE-PM04-SOL-80,80-R11.4/13.0
Award Date03/19/2014
Closeout Date10/12/2018
Work DescriptionREALIGN I-680 TO CONNECT DIRECTLY WITH THE I-80/SR-12 INTERCHANGE.
Location DescriptionIN SOLANO COUNTY NEAR FAIRFIELD.
QA Service Level1 (Verified on 10/17/2013)

Sample Information

Sample Taken Date12/09/2015 Sample Unique Key2
Date that the sample was received by the laboratory/organization performing the testing01/20/2016 Sample typeAnnual Source Testing
A brief description of the sampleFine PCC Aggregate The quantity of what the sample constitutes1 bag
From where was the sample collectedSource First name of sampler or witnessed byDylan
Last name of sampler or witnessed byS Title of samplerPlant Technician
Telephone number of samplerUnknown Laboratory sample identification16FPCC-0022
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameGranite Capay
Transportation Laboratory (TL) Numberc872955 Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-57-0014::CAPAY
The fabricator's/manufacturer's product name for the sampleSand The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedStockpile
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size
The concrete mix design number Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2015-12-09-2
DIME Test ID: 2015-12-09-2-1
Testing Lab: CT HQ - Sacramento Aggregate Testing Laboratory
Test Method: CTM 213-December 2012: Method of Test for Organic Impurities in Concrete Sand
Test Release Date: 2016-02-25

Test Results


Input Type: Calculated
Tester's full name: Tom Stinnett
Date of test: 01/27/2016
Is the sample satisfactory or not?: Yes
Does debris exist: No
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/25/2016 ✔