Summary for Test 2021-11-08-8-1
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 214572 DEA: 034E62U4 EFIS: 0319000068 |
---|---|
DIST-CO-RTE-PM | 03-ED-50-18.5/24.2 |
Award Date | 05/04/2020 |
Closeout Date | Not set |
Work Description | CONSTRUCT UC, MED BARRIER, DRAINAGE SYSTEMS & HMA OVERLAY. |
Location Description | EL DORADO COUNTY IN AND NEAR PLACERVILLE FROM MOSQUITO ROAD UNDERCROSSING TO SCHNELL SCHOOL ROAD UNDERCROSSING AND FROM 0.2 MILE WEST OF STILL MEADOW ROAD TO 0.2 MILE EAST OF CARSON ROAD |
QA Service Level | 1 (Verified on 03/18/2020) |
Sample Information
Sample Taken Date | 11/08/2021 | Sample Unique Key | 8 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/12/2021 |
Sample type | Quality Assurance | A brief description of the sample | #5 Double Barrel Zap Screwlok Couplers |
The quantity of what the sample constitutes | 150 Couplers | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Cassra | Last name of sampler or witnessed by | Bonakdar |
Title of sampler | ASR | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CMC | Transportation Laboratory (TL) Number | C799078 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | CMC |
Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | |
Rebar Size | #5 | Coupler Model | Double Barrel Zap Screwlok |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | 0023 | Rebar Heat Number(s) | 6026767 |
Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2021-11-08-8
DIME Test ID: 2021-11-08-8-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2021-11-15
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: fsaylor
Date of test: 11/09/2021
UTM: 400kip
Temperature: 72 f
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|
1 | 1 | 1 | 5/16mm | 0.31 | 28274.81 | 91209 | Service Splice | fsaylor |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point FileTest graph for the Sample
Test was verified on 11/15/2021 ✔