Summary for Test 2021-11-03-16-4
Test performed: ASTM C231-17aProject Information
Project Identifiers | Project ID: 215753 DEA: 050N72U4 EFIS: 0520000169 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-4.4/R7.7 |
Award Date | 03/01/2021 |
Closeout Date | Not set |
Work Description | Please cc Office Engineer Ni Nyoman Paul on reports sent to RE and SR. Construct High Occupancy Vehicle (HOV) lanes on U.S. Route 101 and rehabilitation - Segment 4B. |
Location Description | 101 freeway in Summerland, CA |
QA Service Level | 1 (Verified on 05/06/2021) |
Sample Information
Sample Taken Date | 11/03/2021 | Sample Unique Key | 16 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/04/2021 |
Sample type | Quality Control | A brief description of the sample | PCC |
The quantity of what the sample constitutes | One box girder | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Roberto | Last name of sampler or witnessed by | Reyes |
Title of sampler | QC Technician | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Con-Fab California, LLC | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | Arroyo Paredon Bridge |
Material Information
Material Type | Concrete | The concrete mix design number | SCC-S95-0F |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 1906 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Back of truck chute | Where the material sample would have been placed if not sampled | box girder |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2021-11-03-16
DIME Test ID: 2021-11-03-16-4
Testing Lab: Con-Fab California, LLC
Test Method: ASTM C231-17a: Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2021-11-10
Test Results
Is wet sieving required?: No
Input Type: Calculated
Tester's full name: Roberto Reyes Perez
Date of test: 11/03/2021
Air content: 1.9 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/10/2021 ✔