Summary for Test 2021-03-18-24-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 214293 DEA: 060S4604 EFIS: 0615000038 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-99-R0.9/R5.0 |
| Award Date | 12/05/2019 |
| Closeout Date | 05/11/2023 |
| Work Description | REPLACE CONCRETE AND ASPHALT PAVEMENT. |
| Location Description | FRESNO COUNTY IN AND NEAR KINGSBURG AND SELMA FROM ROUTE 99/201 SEPARATION TO 0.3 MILE SOUTH OF SECOND STREET UNDERCROSSING |
| QA Service Level | 1 (Verified on 08/05/2019) |
Sample Information
| Sample Taken Date | 03/18/2021 | Sample Unique Key | 24 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/12/2021 |
| Sample type | Dispute Resolution | A brief description of the sample | HMA |
| The quantity of what the sample constitutes | 2 boxes | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | na | Last name of sampler or witnessed by | na |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CMI Fresno | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | c040331 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 3 |
| Sublot number | 5 | HMA Mix Number | Not set |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2021-03-18-24
DIME Test ID: 2021-03-18-24-1
Testing Lab: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2021-11-01
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Glenn Bradley
Date of test: 11/01/2021
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.22 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 4.98 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/1/2021 ✔