Summary for Test 2021-10-14-30-3

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 215063
DEA: 032F5704
EFIS: 0300020615
DIST-CO-RTE-PM03-PLA-80-46.3/63.5
Award Date09/23/2020
Closeout Date08/11/2023
Work DescriptionReplace 4 Bridges (OC) on Highway 80 from Crystal Springs to Cisco Grove (Baxter, Drum Forebay)
Location DescriptionNot set
QA Service Level1 (Verified on 11/16/2020)

Sample Information

Sample Taken Date10/14/2021 Sample Unique Key30
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/14/2021
Sample typeQuality Control A brief description of the sampleWashed Concrete Sand
The quantity of what the sample constitutes1 Day From where was the sample collectedJob Site
First name of sampler or witnessed byBret Last name of sampler or witnessed byUrias
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameHansen Bros - Colfax Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Greenhorn
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedNo Information
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Sizefine
The concrete mix design number7325-6 Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2021-10-14-30
DIME Test ID: 2021-10-14-30-3
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2022-03-29

Test Results


Number of tests: 1
Input Type: Calculated
Tester's full name: Todd Strait
Date of test: 10/15/2021
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 49
Sand reading (test 1): 44
Sand equivalent (test 1): 90
Sand equivalent before temperature correction: 90
Sand equivalent after temperature correction: 90
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/29/2022