Summary for Test 2021-10-08-17-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 214685 DEA: 024E46U4 EFIS: 0216000122 |
|---|---|
| DIST-CO-RTE-PM | 02-LAS-36-6.0/14.6 |
| Award Date | 05/08/2020 |
| Closeout Date | 08/14/2023 |
| Work Description | REPLACE BRIDGE, ROADWAY EXCAVATION, HMA, CLASS 2 AB AND DRAINAGE WORK. |
| Location Description | LASSEN COUNTY NEAR WESTWOOD FROM 1.3 MILES WEST OF GOODRICH CREEK BRIDGE TO 1.0 MILE WEST OF WILLARD CREEK ROAD |
| QA Service Level | 1 (Verified on 03/02/2020) |
Sample Information
| Sample Taken Date | 10/08/2021 | Sample Unique Key | 17 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 10/09/2021 | Sample type | Department Acceptance |
| A brief description of the sample | 3/8 Inch RAP | The quantity of what the sample constitutes | 1 bag RAP for PSE |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | J. |
| Last name of sampler or witnessed by | Delgado | Title of sampler | Consultant |
| Telephone number of sampler | Laboratory sample identification | D78954 | |
| Linked DIME Sample ID | 2021-10-08-16, 2021-10-08-18 | The fabricator/manufacturer/facility name | Hat Creek Construction, Ward Lake Plant, Litchfield, CA |
| Transportation Laboratory (TL) Number | 695653 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Hat Creek Construction and Materials, Ward Lake Facility, Litchfield, CA |
|---|---|---|---|
| Aggregate Size | 3/8 Inch | Aggregate Source | Unknown |
| RAP Stockpile | Continuous | Stockpile Size (tons) | Unknown |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2021-10-08-17
DIME Test ID: 2021-10-08-17-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2021-10-21
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Terry McCormick
Date of test: 10/11/2021
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 6.41 %
General comments (publicly viewable) (Max 1000 characters): Uncorrected binder content of RAP
Test was verified on 10/21/2021 ✔
