Summary for Test 2021-06-01-43-3
Test performed: CTM 518-June 2010Project Information
| Project Identifiers | Project ID: 214176 DEA: 033F0904 EFIS: 0312000056 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC,SJ-5,160-Var |
| Award Date | 10/10/2019 |
| Closeout Date | 10/27/2022 |
| Work Description | REPLACE STRUCTURAL CONCRETE BRIDGES, PLACE CIDH & CISS CONCRETE PILES. |
| Location Description | SACRAMENTO COUNTY AT NORTH SACRAMENTO UNDERCROSSING AND SACRAMENTO RIVER BRIDGE AND IN SAN JOAQUIN COUNTY AT MOKELUMNE RIVER BRIDGE |
| QA Service Level | 1 (Verified on 05/29/2019) |
Sample Information
| Sample Taken Date | 06/01/2021 | Sample Unique Key | 43 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/01/2021 |
| Sample type | Quality Control | A brief description of the sample | Concrete |
| The quantity of what the sample constitutes | 100 cy | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Kristipher | Last name of sampler or witnessed by | Weaver |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Syar | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | CT072AR5 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 87055957 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Pole line road and olive drive | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2021-06-01-43
DIME Test ID: 2021-06-01-43-3
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2022-04-13
Test Results
Input Type: Calculated
Tester's full name: Kristipher Weaver
Date of test: 06/01/2021
Unit weight of the concrete: 148.3 lb/ft^3
Cement content: 0 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/13/2022 ✔
