Summary for Test 2021-08-23-19-3
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 215554 DEA: 061A9004 EFIS: 0621000018 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-5-4.4/R15.8 |
| Award Date | 05/06/2021 |
| Closeout Date | 10/24/2022 |
| Work Description | COLD PLANE & PLACE HMA & INDIVIDUAL SLAB REPLACEMENT. |
| Location Description | KERN COUNTY AT GRAPEVINE FROM 0.4 MILE NORTH OF LEBEC ROAD OVERCROSSING TO ROUTES 5/99 SEPARATION |
| QA Service Level | 1 (Verified on 03/10/2021) |
Sample Information
| Sample Taken Date | 08/23/2021 | Sample Unique Key | 19 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/31/2021 | Sample type | Department Acceptance |
| A brief description of the sample | Asphalt Binder PG 70-10 | The quantity of what the sample constitutes | 1 can |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Isidro |
| Last name of sampler or witnessed by | Perez | Title of sampler | RE |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | San Joaquin Refinery, Bakersfield, CA | |
| Transportation Laboratory (TL) Number | 772216 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 70-10 |
|---|---|---|---|
| Modified | No | Lot number | 1 |
| Sublot number | 4 | Tank number | 32001 |
| Time of sample | HMA Supplier | Vulcan Materials | |
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | Not set | |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2021-08-23-19
DIME Test ID: 2021-08-23-19-3
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-09-14
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 09/08/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 169.604 grams
Mass of empty container #2: 177.016 grams
Mass of container #1 before test (m1i): 206.343 grams
Mass of container #2 before test (m2i): 212.280 grams
Mass of container #1 after test (m1f): 206.344 grams
Mass of container #2 after test (m2f): 212.246 grams
Average mass change: -0.047 percent
General comments (publicly viewable) (Max 1000 characters): per 2018 standard specifications mass change
Test was verified on 9/14/2021 ✔
