Summary for Test 2021-08-27-19-3
Test performed: ASTM D5329-16Project Information
| Project Identifiers | Project ID: 214532 DEA: 07316904 EFIS: 0715000227 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-1,2,5,10-Various |
| Award Date | 01/24/2020 |
| Closeout Date | 08/24/2022 |
| Work Description | TUNNEL LIGHTING, MESSAGE SIGN SYSTEMS, RETAINING WALL & BUILDING WORK. |
| Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 04/15/2020) |
Sample Information
| Sample Taken Date | 08/27/2021 | Sample Unique Key | 19 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/31/2021 | Sample type | Verification |
| A brief description of the sample | Asphalt Rubber Binder | The quantity of what the sample constitutes | 1 Quart Can |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Victor |
| Last name of sampler or witnessed by | Pham | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 0510-21 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Blue Diamond-Victorville | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | |
|---|---|---|---|
| Performance Grade | PG 64-16 | Lot number | |
| Sublot number | Asphalt Rubber Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-08-27-19
DIME Test ID: 2021-08-27-19-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2021-09-02
Test Results
Input Type: Calculated
Tester's full name: Majid Essa
Date of test: 09/02/2021
Temperature: 25 C
Ball Penetration (P1): 4 mm
Final Dial reading (F1): 82 mm
Ball Penetration (P2): 3 mm
Final Dial reading (F2): 82 mm
Ball Penetration (P3): 4 mm
Final Dial reading (F3): 82 mm
Resilience 1: 22 %
Resilience 2: 21 %
Resilience 3: 22 %
Average Resilience: 22 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/2/2021 ✔
