Summary for Test 2021-08-16-18-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 214640
DEA: 042J7204
EFIS: 0415000016
DIST-CO-RTE-PM04-CC-580-1.17
Award Date02/25/2021
Closeout Date12/01/2023
Work DescriptionSTEGE DRAIN SUPER-STRUCTURE, PRECAST VOIDED SLABS
Location DescriptionCONTRA COSTA COUNTY IN RICHMOND FROM 0.3 MILE EAST OF STEGE DRAIN BRIDGE TO 0.3 MILE WEST OF BAYVIEW AVENUE OVERCROSSING
QA Service Level1 (Verified on 01/27/2020)

Sample Information

Sample Taken Date08/16/2021 Sample Unique Key18
Date that the sample was received by the laboratory/organization performing the testing08/19/2021 Sample typeQuality Assurance
A brief description of the samplebearing pad The quantity of what the sample constitutes3
From where was the sample collectedManufacturer First name of sampler or witnessed byPatrick
Last name of sampler or witnessed byLoomis Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameScougal Rubber
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)20209-1
Material/Compound/Elastomer IDna Samples Representing135
Description (size)1.72"x7.5"x7.5" Comments
Description (Number of Shims)3 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Scougal Rubber
Batch Numberna

Test Details

DIME Sample ID: 2021-08-16-18
DIME Test ID: 2021-08-16-18-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2021-08-27

Test Results


Input Type: Calculated
Tester's full name: Mariano Pontillas
Date of test: 08/27/2021
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/27/2021 ✔