Summary for Test 2021-08-10-21-1
Test performed: ASTM C136-19Project Information
Project Identifiers | Project ID: 214951 DEA: 120K0234 EFIS: 1214000100 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-17.1/18.9 |
Award Date | 09/23/2020 |
Closeout Date | Not set |
Work Description | South County Improvement Project (Phase 3 - El Toro/Alicia) WIDEN FREEWAY AND BRIDGES, RECONSTRUCT BRIDGE AND WALLS. |
Location Description | ORANGE COUNTY IN MISSION VIEJO, LAGUNA HILLS, LAGUNA WOODS AND LAKE FOREST FROM 0.4 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING TO 0.2 MILE NORTH OF EL TORO ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 10/01/2020) |
Sample Information
Sample Taken Date | 08/10/2021 | Sample Unique Key | 21 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/09/2021 |
Sample type | Quality Control | A brief description of the sample | washed 3/8 inch |
The quantity of what the sample constitutes | 1010 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Roberto | Last name of sampler or witnessed by | Reyes |
Title of sampler | QC Technician | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Con-Fab California LLC | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | SMARA 91 15 0041 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | silo | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/8 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2021-08-10-21
DIME Test ID: 2021-08-10-21-1
Testing Lab: Con-Fab California, LLC
Test Method: ASTM C136-19: Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-08-20
Test Results
What type of gradation is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Has the fine aggregate sample been reduced? (question for combined gradation type):
Input Type: Calculated
Tester's full name: Roberto Reyes
Date of test: 08/10/2021
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 58 %
Cumulative percent passing the 3/8 in. sieve: 53 %
Cumulative percent passing the #4 sieve: 8 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/20/2021 ✔