Summary for Test 2021-02-23-18-3

Test performed: CTM 557-July 2012

Project Information

Project IdentifiersProject ID: 212324
DEA: 033F5104
EFIS: 0313000020
DIST-CO-RTE-PM03-YUB-20-R18.1/R20.1
Award Date10/31/2019
Closeout Date08/03/2023
Work DescriptionConstruct bridge, realign curve & widen shoulders.
Location DescriptionConstruction on state highway in Yuba County near Smartsville from the Yuba River Bridge to 0.3 mile east of Smartsville Road.
QA Service Level1 (Verified on 02/27/2020)

Sample Information

Sample Taken Date02/23/2021 Sample Unique Key18
Date that the sample was received by the laboratory/organization performing the testing02/24/2021 Sample typeQuality Control
A brief description of the samplePCC The quantity of what the sample constitutes4 cylinders
From where was the sample collectedJob Site First name of sampler or witnessed byMatthew
Last name of sampler or witnessed byHorn Title of samplerQC Technician
Telephone number of sampler5592922188 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameA and A Concrete Supply Inc
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberZ5685249
The truck number from where the sample was collected0437 The batch plant ticket number from where the sample was collected3173946
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedTruck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2021-02-23-18
DIME Test ID: 2021-02-23-18-3
Testing Lab: Trinity Engineering Laboratories, Incorporated - Fresno
Test Method: CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement Concrete
Test Release Date: 2021-08-17

Test Results


Input Type: Calculated
Tester's full name: Matthew Horn
Date of test: 02/23/2021
Temperature of the freshly mixed concrete: 72 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/17/2021 ✔