Summary for Test 2021-08-06-19-1
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 213750 DEA: 120K0224 EFIS: 1214000097 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-5-14.5/17.1 |
| Award Date | 03/05/2019 |
| Closeout Date | 03/13/2025 |
| Work Description | South County Improvement Project (Phase 2 - Oso/Alicia) CONST BRIDGES, RW, SW, HMA PVMT, JPCP, DRAINAGE, AND ELECT SYSTEMS. |
| Location Description | ORANGE COUNTY IN MISSION VIEJO AND LAGUNA HILLS FROM 0.7 MILE SOUTH OF OSO PARKWAY OVERCROSSING TO 0.3 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING |
| QA Service Level | 1 (Verified on 04/15/2019) |
Sample Information
| Sample Taken Date | 08/06/2021 | Sample Unique Key | 19 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/12/2021 |
| Sample type | Quality Assurance | A brief description of the sample | #11 Zap Screwlok Couplers |
| The quantity of what the sample constitutes | 50 Couplers | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Jason | Last name of sampler or witnessed by | Kim |
| Title of sampler | ASR | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Flatiron | Transportation Laboratory (TL) Number | C809403 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | Vinton Steel |
| Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | |
| Rebar Size | #11 | Coupler Model | Zap Screwlok Type 2 |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | MM20106092 | Rebar Heat Number(s) | 21R0414 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2021-08-06-19
DIME Test ID: 2021-08-06-19-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2021-08-13
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: fsaylor
Date of test: 08/13/2021
UTM: 2000kip
Temperature: 72.00 f
Halo ID: Large
| Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | No. 11/36mm | 1 | -0.0025 | 1.56 | 149693 | 95957 | Service Splice | fsaylor |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 8/13/2021 ✔
