Summary for Test 2021-06-23-36-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 215367 DEA: 021J4904 EFIS: 0220000084 |
---|---|
DIST-CO-RTE-PM | 02-TEH-32-14.0/20.0 |
Award Date | 02/02/2021 |
Closeout Date | 04/11/2024 |
Work Description | PLACE HOT MIX ASPHALT (TYPE A). |
Location Description | TEHAMA COUNTY ABOUT 28 MILES EAST OF FOREST RANCH FROM 1.1 MILES EAST OF DEER CREEK BRIDGE NO. 08-0068 TO 0.4 MILE WEST OF SLATE CREEK BRIDGE NO. 08-0154 |
QA Service Level | 1 (Verified on 12/24/2020) |
Sample Information
Sample Taken Date | 06/23/2021 | Sample Unique Key | 36 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/02/2021 |
Sample type | Department Acceptance | A brief description of the sample | PG 64-16 |
The quantity of what the sample constitutes | 1 OF 2 CANS | From where was the sample collected | Source |
First name of sampler or witnessed by | Derek | Last name of sampler or witnessed by | PEI |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Albina Asphalt - Klamath FAlls, OR | Transportation Laboratory (TL) Number | 896905 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
---|---|---|---|
Modified | Lot number | ||
Sublot number | Tank number | ||
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | Albina Asphalt - Klamath Falls Plant - Klamath Falls OR | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-06-23-36
DIME Test ID: 2021-06-23-36-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-08-16
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 08/10/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 160.673 grams
Mass of empty container #2: 167.023 grams
Mass of container #1 before test (m1i): 196.454 grams
Mass of container #2 before test (m2i): 202.597 grams
Mass of container #1 after test (m1f): 196.411 grams
Mass of container #2 after test (m2f): 202.553 grams
Average mass change: -0.122 percent
General comments (publicly viewable) (Max 1000 characters): as per 2018 standard specs
Test was verified on 8/16/2021 ✔