Summary for Test 2021-08-03-17-6
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 215494 DEA: 081H4904 EFIS: 0817000059 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-18-31.9/38.5 |
| Award Date | 04/05/2021 |
| Closeout Date | 01/18/2022 |
| Work Description | COLD PLANE AC PAVEMENT AND OVERLAY WITH HMA (TYPE A). |
| Location Description | SAN BERNARDINO COUNTY FROM 0.1 MILE EAST OF HILLTOP CONNECTOR TO 0.5 MILE EAST OF SIBERIA CREEK TRAIL |
| QA Service Level | 1 (Verified on 07/06/2021) |
Sample Information
| Sample Taken Date | 08/03/2021 | Sample Unique Key | 17 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/05/2021 | Sample type | Verification |
| A brief description of the sample | PG Asphalt Binder | The quantity of what the sample constitutes | 1 Quart Can |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Matich QC |
| Last name of sampler or witnessed by | Matich QC | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 0445-21 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Matich-Rialto | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-28 M |
|---|---|---|---|
| Modified | Yes | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | Matich-Rialto | |
| Certified Asphalt Supplier | Marathon Petroleum Co. LP - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | Not set | |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2021-08-03-17
DIME Test ID: 2021-08-03-17-6
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-08-09
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Babak Rezaei
Date of test: 08/06/2021
Any material loss from containers during heating process/testing?: no data
Mass of empty container #1: 169.381 grams
Mass of empty container #2: 167.302 grams
Mass of container #1 before test (m1i): 204.680 grams
Mass of container #2 before test (m2i): 202.353 grams
Mass of container #1 after test (m1f): 204.627 grams
Mass of container #2 after test (m2f): 202.300 grams
Average mass change: -0.151 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/9/2021 ✔