Summary for Test 2021-07-22-28-1

Test performed: AASHTO T240-17

Project Information

Project IdentifiersProject ID: 214926
DEA: 010E7204
EFIS: 0115000003
DIST-CO-RTE-PM01-LAK-29-12.7/14.5
Award Date07/07/2020
Closeout Date07/21/2022
Work DescriptionROADWAY EXCAVATION, HMA (TYPE A), RHMA-G, DRAINAGE & EROSION CONTROL.
Location DescriptionLAKE COUNTY NEAR LOWER LAKE FROM 0.8 MILE NORTH OF SPRUCE GROVE ROAD SOUTH TO 0.4 MILE SOUTH OF HOFACKER LANE
QA Service Level1 (Verified on 06/10/2020)

Sample Information

Sample Taken Date07/22/2021 Sample Unique Key28
Date that the sample was received by the laboratory/organization performing the testing07/28/2021 Sample typeDepartment Acceptance
A brief description of the samplePG64-16 The quantity of what the sample constitutes1 can
From where was the sample collectedSource First name of sampler or witnessed byK
Last name of sampler or witnessed byPoulter Title of samplerTET
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameBodean - Santa Rosa
Transportation Laboratory (TL) Number934711 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 64-16
Modified Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierValero Marketing & Supply - Benicia CA MultigradeNo
Multigrade Type Asphalt Binder Mix NumberNot set
HMA TypeNot set HMA Supplier Mix ID NumberNot set

Test Details

DIME Sample ID: 2021-07-22-28
DIME Test ID: 2021-07-22-28-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-08-10

Test Results


Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Erika Gonzalez
Date of test: 08/02/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 169.882 grams
Mass of empty container #2: 174.715 grams
Mass of container #1 before test (m1i): 205.135 grams
Mass of container #2 before test (m2i): 209.731 grams
Mass of container #1 after test (m1f): 204.981 grams
Mass of container #2 after test (m2f): 209.586 grams
Average mass change: -0.425 percent
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard Specifications

Test was verified on 8/10/2021 ✔