Summary for Test 2021-07-15-25-9

Test performed: AASHTO T301-13

Project Information

Project IdentifiersProject ID: 55556
DEA: OCR
EFIS: OCR
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for Oregon Corp. Research.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date07/15/2021 Sample Unique Key25
Date that the sample was received by the laboratory/organization performing the testing07/21/2021 Sample typeProficiency
A brief description of the samplePG58V-22 The quantity of what the sample constitutes1 of 1 can
From where was the sample collectedSource First name of sampler or witnessed byna
Last name of sampler or witnessed byna Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameUS Oil
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 58-22
Modified Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierOregon Corp - Salem OR MultigradeNo
Multigrade Type Asphalt Binder Mix NumberNot set
HMA TypeNot set HMA Supplier Mix ID NumberNot set

Test Details

DIME Sample ID: 2021-07-15-25
DIME Test ID: 2021-07-15-25-9
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T301-13: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2021-08-13

Test Results


Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 07/26/2021
Final Reading from the testing machine (X): 3 cm
% Elongation Recovery: 85 %
General comments (publicly viewable) (Max 1000 characters): ER @ 25c

Test was verified on 8/13/2021 ✔