Summary for Test 2021-07-02-22-2
Test performed: CTM 557-June 2020Project Information
Project Identifiers | Project ID: 214572 DEA: 034E62U4 EFIS: 0319000068 |
---|---|
DIST-CO-RTE-PM | 03-ED-50-18.5/24.2 |
Award Date | 05/04/2020 |
Closeout Date | Not set |
Work Description | CONSTRUCT UC, MED BARRIER, DRAINAGE SYSTEMS & HMA OVERLAY. |
Location Description | EL DORADO COUNTY IN AND NEAR PLACERVILLE FROM MOSQUITO ROAD UNDERCROSSING TO SCHNELL SCHOOL ROAD UNDERCROSSING AND FROM 0.2 MILE WEST OF STILL MEADOW ROAD TO 0.2 MILE EAST OF CARSON ROAD |
QA Service Level | 1 (Verified on 03/18/2020) |
Sample Information
Sample Taken Date | 07/02/2021 | Sample Unique Key | 22 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/06/2021 |
Sample type | Quality Control | A brief description of the sample | Concrete |
The quantity of what the sample constitutes | 100 cy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Andrew | Last name of sampler or witnessed by | Clarke |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Syar | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | AE075CC5WA |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 41045403 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | APPROACH AND SLAB STAGE 2B | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2021-07-02-22
DIME Test ID: 2021-07-02-22-2
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2021-07-09
Test Results
Input Type: Calculated
Tester's full name: Andrew Clarke
Date of test: 07/02/2021
Temperature: 83 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/9/2021 ✔