Summary for Test 2021-06-25-7-1
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 215093 DEA: 101C2804 EFIS: 1014000134 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-99-30.9/31.3 |
| Award Date | 10/21/2020 |
| Closeout Date | 08/30/2023 |
| Work Description | RAISED BRIDGES, REALIGN RAMPS AND CONSTRUCT AUXILIARY LANE. |
| Location Description | SAN JOAQUIN COUNTY IN LODI FROM 0.4 MILE SOUTH OF ROUTE 12/99 SEPARATION TO 0.3 MILE SOUTH OF TURNER ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 08/21/2020) |
Sample Information
| Sample Taken Date | 06/25/2021 | Sample Unique Key | 7 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/02/2021 | Sample type | Department Acceptance |
| A brief description of the sample | PG64-16 | The quantity of what the sample constitutes | 1 can |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | J |
| Last name of sampler or witnessed by | Dehoff | Title of sampler | Inspector |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | na | |
| Transportation Laboratory (TL) Number | c760575 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | No | Lot number | 1 |
| Sublot number | 1 | Tank number | |
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | Not set | |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2021-06-25-7
DIME Test ID: 2021-06-25-7-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-07-07
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Erika Gonzalez
Date of test: 07/06/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 174.716 grams
Mass of empty container #2: 179.440 grams
Mass of container #1 before test (m1i): 209.716 grams
Mass of container #2 before test (m2i): 214.457 grams
Mass of container #1 after test (m1f): 209.641 grams
Mass of container #2 after test (m2f): 214.380 grams
Average mass change: -0.217 percent
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard Specifications
Test was verified on 7/7/2021 ✔