Summary for Test 2021-06-21-22-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 215179
DEA: 010F4704
EFIS: 0116000011
DIST-CO-RTE-PM01-HUM-299-30.7/37.7
Award Date11/19/2020
Closeout Date11/27/2023
Work DescriptionPLACE HMA & RHMA-G & CONSTRUCT SOLDIER PILE WALL.
Location DescriptionHUMBOLDT COUNTY NEAR WILLOW CREEK AT VARIOUS LOCATIONS FROM 0.1 MILE EAST OF CEDAR CREEK ROAD TO 1.1 MILES WEST OF ROUTE 96 JUNCTION
QA Service Level1 (Verified on 09/15/2020)

Sample Information

Sample Taken Date06/21/2021 Sample Unique Key22
Date that the sample was received by the laboratory/organization performing the testing06/30/2021 Sample typeQuality Assurance
A brief description of the samplebearing pad The quantity of what the sample constitutes1
From where was the sample collectedManufacturer First name of sampler or witnessed byPatrick
Last name of sampler or witnessed byLoomis Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameScougal Rubber
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)20323-1
Material/Compound/Elastomer IDna Samples Representing77
Description (size)1.15"x14.5"x13.5" Comments
Description (Number of Shims)2 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Scougal Rubber
Batch Numberna

Test Details

DIME Sample ID: 2021-06-21-22
DIME Test ID: 2021-06-21-22-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2021-07-02

Test Results


Input Type: Measured
Tester's full name: Yared Melketsadik
Date of test: 07/02/2021
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/2/2021 ✔