Summary for Test 2021-06-25-1-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 215257
DEA: 11056374
EFIS: 1117000087
DIST-CO-RTE-PM11-SD-11-0.6/2.7
Award Date02/16/2021
Closeout DateNot set
Work DescriptionCONSTRUCT INTERCHANGE, PLACE JPCP, HMA, AND INSTALL LIGHTING.
Location DescriptionSAN DIEGO COUNTY NEAR SAN DIEGO FROM 0.2 MILE WEST OF SANYO AVENUE UNDERCROSSING TO 1.2 MILE EAST OF ENRICO FERMI DRIVE OVERCROSSING
QA Service Level1 (Verified on 11/25/2020)

Sample Information

Sample Taken Date06/25/2021 Sample Unique Key1
Date that the sample was received by the laboratory/organization performing the testing06/29/2021 Sample typeQuality Assurance
A brief description of the samplebearing pad The quantity of what the sample constitutes1
From where was the sample collectedManufacturer First name of sampler or witnessed byPatrick
Last name of sampler or witnessed byLoomis Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameScougal Rubber
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)20217-1
Material/Compound/Elastomer IDna Samples Representing23
Description (size)3.45"x18"x21" Comments
Description (Number of Shims)6 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Scougal Rubber
Batch Numberna

Test Details

DIME Sample ID: 2021-06-25-1
DIME Test ID: 2021-06-25-1-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2021-07-01

Test Results


Input Type: Measured
Tester's full name: Kirolos Kelada
Date of test: 07/01/2021
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/1/2021 ✔