Summary for Test 2021-05-25-39-1

Test performed: ASTM C143-15a

Project Information

Project IdentifiersProject ID: 214572
DEA: 034E62U4
EFIS: 0319000068
DIST-CO-RTE-PM03-ED-50-18.5/24.2
Award Date05/04/2020
Closeout Date07/15/2025
Work DescriptionCONSTRUCT UC, MED BARRIER, DRAINAGE SYSTEMS & HMA OVERLAY.
Location DescriptionEL DORADO COUNTY IN AND NEAR PLACERVILLE FROM MOSQUITO ROAD UNDERCROSSING TO SCHNELL SCHOOL ROAD UNDERCROSSING AND FROM 0.2 MILE WEST OF STILL MEADOW ROAD TO 0.2 MILE EAST OF CARSON ROAD
QA Service Level1 (Verified on 03/18/2020)

Sample Information

Sample Taken Date05/25/2021 Sample Unique Key39
Date that the sample was received by the laboratory/organization performing the testing05/26/2021 Sample typeQuality Control
A brief description of the sampleConcrete The quantity of what the sample constitutes100 CY
From where was the sample collectedJob Site First name of sampler or witnessed byEric
Last name of sampler or witnessed byColligan Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameSyar
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberCT072CR5W
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected41045017
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBASE FOR BRIDGE SIDE WALL Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2021-05-25-39
DIME Test ID: 2021-05-25-39-1
Testing Lab: RMA Group - Rancho Cordova
Test Method: ASTM C143-15a: Standard Test Method for Slump of Hydraulic-Cement Concrete
Test Release Date: 2021-07-01

Test Results


Input Type: Calculated
Tester's full name: Eric Colligan
Date of test: 05/25/2021
Slump: 3 inch
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/1/2021 ✔