Summary for Test 2021-06-17-37-1

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 212777
DEA: 021H1104
EFIS: 0215000106
DIST-CO-RTE-PM02-LAS-299-25.58/25.58
Award Date12/04/2019
Closeout Date08/14/2023
Work DescriptionBUILDING WORK.
Location DescriptionLASSEN COUNTY ABOUT 11 MILES EAST OF BIEBER AT THE ADIN MAINTENANCE STATION
QA Service Level1 (Verified on 01/08/2019)

Sample Information

Sample Taken Date06/17/2021 Sample Unique Key37
Date that the sample was received by the laboratory/organization performing the testing06/21/2021 Sample typeDepartment Acceptance
A brief description of the sample1 bag of Combined RAP (3/8-inch) The quantity of what the sample constitutesProduction Start-Up Evaluation
From where was the sample collectedManufacturer First name of sampler or witnessed byEmilio
Last name of sampler or witnessed byChavez Title of sampler
Telephone number of sampler Laboratory sample identificationD78847D
Linked DIME Sample ID The fabricator/manufacturer/facility nameEagle Peak Rock and Paving – Alturas Plant (Alturas, CA)
Transportation Laboratory (TL) Number766443 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameNot Applicable
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceEagle Peak Rock and Paving, Alturas Plant, Alturas, CA
Aggregate Size3/8-inch Aggregate SourceUnknown
RAP Stockpile Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2021-06-17-37
DIME Test ID: 2021-06-17-37-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2022-01-13

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Terry McCormick
Date of test: 06/22/2021
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 7.71 %
General comments (publicly viewable) (Max 1000 characters): Pb ≈ 5.51%

Test was verified on 1/13/2022 ✔