Summary for Test 2021-06-14-33-3
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 215250 DEA: 021J4404 EFIS: 0220000079 |
|---|---|
| DIST-CO-RTE-PM | 02-MOD-299-20.0/23.1,23.5/24.5,33.5/37.5 |
| Award Date | 12/14/2020 |
| Closeout Date | 09/27/2021 |
| Work Description | ASPHALT RUBBER CHIP SEAL. |
| Location Description | MODOC COUNTY AT VARIOUS LOCATIONS FROM 1.8 MILES WEST OF ROUTE 139 TO 0.3 MILE WEST OF RATTLESNAKE CREEK BRIDGE |
| QA Service Level | 1 (Verified on 10/30/2020) |
Sample Information
| Sample Taken Date | 06/14/2021 | Sample Unique Key | 33 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/15/2021 | Sample type | Department Acceptance |
| A brief description of the sample | 2 bags of 3/8-inch RAP (Combined) | The quantity of what the sample constitutes | Production Start-Up Evaluation |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Cindy |
| Last name of sampler or witnessed by | Bryant | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | D78844D | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Eagle Peak Rock and Paving – Alturas Plant (Alturas, CA) | |
| Transportation Laboratory (TL) Number | 853348 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Eagle Peak Rock and Paving, Alturas Plant, Alturas, CA |
|---|---|---|---|
| Aggregate Size | 3/8-inch | Aggregate Source | Eagle Peak |
| RAP Stockpile | Continuous | Stockpile Size (tons) | Unknown |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2021-06-14-33
DIME Test ID: 2021-06-14-33-3
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2021-12-30
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Terry McCormick
Date of test: 06/16/2021
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 7.38 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/30/2021 ✔