Summary for Test 2021-05-28-22-8

Test performed: CTM 205-December 2010

Project Information

Project IdentifiersProject ID: 215252
DEA: 021J4704
EFIS: 0220000082
DIST-CO-RTE-PM02-TRI-3-46.7/49.8,63.8/67.704
Award Date12/18/2020
Closeout Date09/30/2021
Work DescriptionHMA OVERLAY, REPLACE AC SURFACING AND SHOULDER BACKING.
Location DescriptionTRINITY COUNTY NEAR TRINITY CENTER FROM 0.7 MILE NORTH OF CEDAR STOCK ROAD TO DIENER MINE VIADUCT AND FROM 2.3 MILES NORTH OF EL DORADO WAY TO COFFEE CREEK BRIDGE NO. 05-0060
QA Service Level1 (Verified on 10/30/2020)

Sample Information

Sample Taken Date05/28/2021 Sample Unique Key22
Date that the sample was received by the laboratory/organization performing the testing05/28/2021 Sample typeDepartment Acceptance
A brief description of the sampleShoulder Backing The quantity of what the sample constitutes 3 Bags
From where was the sample collectedManufacturer First name of sampler or witnessed byJohn
Last name of sampler or witnessed byCarmichael Title of samplerConsultant
Telephone number of sampler Laboratory sample identificationD78814
Linked DIME Sample ID The fabricator/manufacturer/facility nameEagle Rock Inc, Junction City
Transportation Laboratory (TL) Number779361 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-23-0001
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedStock Pile at Eagle Rock Inc
Where the material sample would have been placed if not sampled02 TRI 3 PM 46 to 50 Primary Aggregate Nominal Size1 inch
The concrete mix design numberNot Applicable Lot numberUnknown
Sublot numberUnknown Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2021-05-28-22
DIME Test ID: 2021-05-28-22-8
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 205-December 2010: Method of Test for Determining Percentage of Crushed Particles
Test Release Date: 2021-08-10

Test Results


Will you be using 1/4 in. x No. 4 sieve?: No
Input Type: Calculated
Tester's full name: Terry McCormick
Date of test: 06/02/2021
Percent Coarse Crushed: 94 %
Percent Fine Crushed: 0 %
General comments (publicly viewable) (Max 1000 characters): 94% of coarse aggregate is crushed with at least two faces. Percentage of crushed fine aggregate was not determined.

Test was verified on 8/10/2021 ✔