Summary for Test 2021-05-27-34-5
Test performed: AASHTO T313-19Project Information
Project Identifiers | Project ID: 212324 DEA: 033F5104 EFIS: 0313000020 |
---|---|
DIST-CO-RTE-PM | 03-YUB-20-R18.1/R20.1 |
Award Date | 10/31/2019 |
Closeout Date | 08/03/2023 |
Work Description | Construct bridge, realign curve & widen shoulders. |
Location Description | Construction on state highway in Yuba County near Smartsville from the Yuba River Bridge to 0.3 mile east of Smartsville Road. |
QA Service Level | 1 (Verified on 02/27/2020) |
Sample Information
Sample Taken Date | 05/27/2021 | Sample Unique Key | 34 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/14/2021 |
Sample type | Department Acceptance | A brief description of the sample | Asphalt Binder Sample |
The quantity of what the sample constitutes | 2 Cans | From where was the sample collected | Source |
First name of sampler or witnessed by | Not Provided | Last name of sampler or witnessed by | Not Provided |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Marathon | Transportation Laboratory (TL) Number | 741875 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
---|---|---|---|
Modified | No | Lot number | 5 |
Sublot number | 1 | Tank number | |
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | Marathon Petroleum Co. LP - Elk Grove CA | Multigrade | No |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-05-27-34
DIME Test ID: 2021-05-27-34-5
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T313-19: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Test Release Date: 2021-06-17
Test Results
Input Type: Measured
Tester's full name: Ruben Macias
Date of test: 06/16/2021
Minimum test bath temperature at 240 s: -6.0 C
Maximum test bath temperature at 240 s: -6.0 C
Time of test load application: no data
File name of test data: no data
Time beam in bath: no data
Time test started: no data
Flags issued by software during test: no data
Correlation coefficient (R²): 0
Regression coefficient a: no data
Regression coefficient b: no data
Regression coefficient c: no data
Load at time 0.0: 0.0 mN
Deflection at time 0.0 s: 0.000 µm
Load at time 0.5 s: 0.0 mN
Deflection at time 0.5 s: 0.000 µm
Load at 60.0 s: 972.0 mN
Beam deflection 60.0 s: 0.904 µm
Measured Stiffness Modulus 60.0 s: 86.700 mPa
Estimated Stiffness Modulus 60.0 s: 86.500 mPa
Difference between stiffness moduli 60.0 s: no data
Estimated m-value 60.0 s: 0.382
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard Specifications
Test was verified on 6/17/2021 ✔