Summary for Test 2021-04-01-40-3
Test performed: AASHTO T30-19Project Information
| Project Identifiers | Project ID: 214426 DEA: 030A5704 EFIS: 0300020593 |
|---|---|
| DIST-CO-RTE-PM | 03-YUB-20-13.3/R18.2 |
| Award Date | 01/02/2020 |
| Closeout Date | 07/15/2025 |
| Work Description | Browns Valley Rehab: CONSTRUCT BRIDGE, REALIGN CURVE, WIDEN SHOULDERS AND CULVERT WORK. |
| Location Description | YUBA COUNTY FROM MARYSVILLE ROAD TO THE YUBA RIVER BRIDGE |
| QA Service Level | 1 (Verified on 10/23/2019) |
Sample Information
| Sample Taken Date | 04/01/2021 | Sample Unique Key | 40 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/01/2021 |
| Sample type | Verification | A brief description of the sample | RAP minus 1/2" |
| The quantity of what the sample constitutes | JMF Verification | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Teichert Personnel (SAMPLER) | Last name of sampler or witnessed by | Brad McKeehan (WITNESS) |
| Title of sampler | Unknown | Telephone number of sampler | Unknown |
| Laboratory sample identification | JMF21-020C | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Teichert - Hallwood Plant | Transportation Laboratory (TL) Number | C706329 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Teichert Hallwood RAP Bin 1 |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Static | Stockpile Size (tons) | Unknown |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2021-04-01-40
DIME Test ID: 2021-04-01-40-3
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2021-06-10
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Mario Munoz
Date of test: 04/07/2021
| Cumulative Percent Passing | ||||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 96 % | ||||||
| 85 % | ||||||
| 58 % | ||||||
| 40 % | ||||||
| 30 % | ||||||
| 23 % | ||||||
| 16 % | ||||||
| 12 % | ||||||
| 9.0 % | ||||||
General comments (publicly viewable) (Max 1000 characters): JMF21-020C.
Test was verified on 6/10/2021 ✔
