Summary for Test 2021-05-06-8-2
Test performed: CTM TEMP1-16Project Information
Project Identifiers | Project ID: 214702 DEA: 030F2864 EFIS: 0320000123 |
---|---|
DIST-CO-RTE-PM | 03-SAC-99-7.92 / 8.4 |
Award Date | 06/24/2020 |
Closeout Date | 11/28/2023 |
Work Description | Remove and replace Consumnes River and Consumnes River Overflow bridge |
Location Description | Sacramento County |
QA Service Level | 1 (Verified on 04/20/2020) |
Sample Information
Sample Taken Date | 05/06/2021 | Sample Unique Key | 8 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/07/2021 |
Sample type | Quality Control | A brief description of the sample | 6x12 concrete cylinders |
The quantity of what the sample constitutes | 2 6x12 concrete cylinders | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Mark Patrick | Last name of sampler or witnessed by | Baddu |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Con-Fab California, LLC | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | VER-95LV |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 669 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Bed 7, 2nd Truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2021-05-06-8
DIME Test ID: 2021-05-06-8-2
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: CTM TEMP1-16: Test Method for Monitoring Precast Concrete Curing Temperature (Curing temperature)
Test Release Date: 2021-05-11
Test Results
Input Type: Calculated
Tester's full name: Danny Cabias
Date of test: 05/06/2021
Precast Maximum Curing Temperature: 137.5 °F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/11/2021 ✔