Summary for Test 2021-05-04-3-2
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 215063 DEA: 032F5704 EFIS: 0300020615 |
|---|---|
| DIST-CO-RTE-PM | 03-PLA-80-46.3/63.5 |
| Award Date | 09/23/2020 |
| Closeout Date | 08/11/2023 |
| Work Description | Replace 4 Bridges (OC) on Highway 80 from Crystal Springs to Cisco Grove (Baxter, Drum Forebay) |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 11/16/2020) |
Sample Information
| Sample Taken Date | 05/04/2021 | Sample Unique Key | 3 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/06/2021 |
| Sample type | Quality Assurance | A brief description of the sample | Couplers |
| The quantity of what the sample constitutes | 116 | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | James | Last name of sampler or witnessed by | Doe |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Camblin Steel | Transportation Laboratory (TL) Number | C740677 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | S50-012-21 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Authorization Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | Nucor |
| Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | |
| Rebar Size | #11 | Coupler Model | HRC 500/510 |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 73120296 74119266 | Rebar Heat Number(s) | 350001332420 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2021-05-04-3
DIME Test ID: 2021-05-04-3-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2021-05-06
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 05/06/2021
UTM: 2000kip
Temperature: 72.00 f
Halo ID:
| Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 2 | No. 11/36mm | 1 | 0 | 1.56 | 154071 | 98764 | Ok Necking | bewing |
General comments (publicly viewable) (Max 1000 characters): Ok Necking
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 5/6/2021 ✔
