Summary for Test 2021-04-26-9-2
Test performed: CTM TEMP1-16Project Information
| Project Identifiers | Project ID: 214702 DEA: 030F2864 EFIS: 0320000123 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-99-7.92 / 8.4 |
| Award Date | 06/24/2020 |
| Closeout Date | 11/28/2023 |
| Work Description | Remove and replace Consumnes River and Consumnes River Overflow bridge |
| Location Description | Sacramento County |
| QA Service Level | 1 (Verified on 04/20/2020) |
Sample Information
| Sample Taken Date | 04/26/2021 | Sample Unique Key | 9 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/27/2021 | Sample type | Quality Control |
| A brief description of the sample | 6x12 concrete cylinders | The quantity of what the sample constitutes | 2 6x12 concrete cylinders |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Mark Patrick |
| Last name of sampler or witnessed by | Baddu | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Con-Fab California, LLC | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | VER-95LV |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 3336 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Bed 7, 3rd Truck | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2021-04-26-9
DIME Test ID: 2021-04-26-9-2
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: CTM TEMP1-16: Test Method for Monitoring Precast Concrete Curing Temperature (Curing temperature)
Test Release Date: 2021-04-27
Test Results
Input Type: Calculated
Tester's full name: Danny Cabias
Date of test: 04/27/2021
Precast Maximum Curing Temperature: 135.5 °F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/27/2021 ✔
