Summary for Test 2021-04-20-7-1
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 215405 DEA: 032G1604 EFIS: 0320000235 |
|---|---|
| DIST-CO-RTE-PM | 03-YOL-45-0.6/12.9 |
| Award Date | 02/16/2021 |
| Closeout Date | 06/30/2021 |
| Work Description | COLD PLANE AC PAVEMENT AND REPLACE WITH HOT MIX ASPHALT. |
| Location Description | YOLO COUNTY NEAR KNIGHTS LANDING FROM SYCAMORE SLOUGH BRIDGE TO YOLO COUNTY LINE ROAD |
| QA Service Level | 1 (Verified on 01/18/2021) |
Sample Information
| Sample Taken Date | 04/20/2021 | Sample Unique Key | 7 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/20/2021 | Sample type | Department Acceptance |
| A brief description of the sample | Binder | The quantity of what the sample constitutes | 1 of 1 can |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Sam |
| Last name of sampler or witnessed by | Mosallem | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Teichert Hollwood | |
| Transportation Laboratory (TL) Number | 783760 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | No | Lot number | 1 |
| Sublot number | 10 | Tank number | |
| Time of sample | HMA Supplier | Teichert Hollwood | |
| Certified Asphalt Supplier | Marathon Petroleum Co. LP - Elk Grove CA | Multigrade | No |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2021-04-20-7
DIME Test ID: 2021-04-20-7-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-05-03
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 04/21/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 172.611 grams
Mass of empty container #2: 171.426 grams
Mass of container #1 before test (m1i): 207.843 grams
Mass of container #2 before test (m2i): 206.477 grams
Mass of container #1 after test (m1f): 207.732 grams
Mass of container #2 after test (m2f): 206.365 grams
Average mass change: -0.317 percent
General comments (publicly viewable) (Max 1000 characters): as per 2018 standard specs
Test was verified on 5/3/2021 ✔
