Summary for Test 2015-05-27-2-2
Test performed: CTM 521-November 2014Project Information
Project Identifiers | Project ID: 208862 DEA: 080K7104 EFIS: 0800000366 |
---|---|
DIST-CO-RTE-PM | 08-SBD-15,215-14.0/R16.4,16.0/17.8 |
Award Date | 11/13/2012 |
Closeout Date | 02/13/2017 |
Work Description | I-15/I-215 Interchange Improvements (Devore) |
Location Description | On I-15 from 0.8 mile south of Glen Helen Parkway UC to 1.4 mile north of Kenwood Ave UC And On I-215 from 1.2 mile south of Devore Road OC to the I-15 junction |
QA Service Level | 1 (Verified on 06/10/2013) |
Sample Information
Sample Taken Date | 05/27/2015 | Sample Unique Key | 2 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/28/2015 |
Sample type | Quality Control | A brief description of the sample | 6X12 |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | RAVINDER | Last name of sampler or witnessed by | SINGH |
Title of sampler | ASR | Telephone number of sampler | Unknown |
Laboratory sample identification | 868-08 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | JOB | Transportation Laboratory (TL) Number | 0508 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | BRRIDGE 22 STEM AND SOFFIT |
Structure name | POUR 4 BRIDGE 22 |
Material Information
Material Type | Concrete | The concrete mix design number | CT1-C4500DI |
---|---|---|---|
The truck number from where the sample was collected | 8 | The batch plant ticket number from where the sample was collected | NP |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | CHUTE | Where the material sample would have been placed if not sampled | Unknown |
From Lot No. | Not set | Bag Lot No. | Not set |
Test Details
DIME Sample ID: 2015-05-27-2
DIME Test ID: 2015-05-27-2-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2015-07-09
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Measured
Tester's full name: Matthew Clayton
Date of test: 07/08/2015
Average diameter of cylinder 1: 5.99 in
Average diameter of cylinder 2: 5.99 in
Maximum load on cylinder 1: 123610 lb
Maximum load on cylinder 2: 123150 lb
Type of fracture pattern of cylinder 1: 1
Type of fracture pattern of cylinder 2: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Age of specimen: 42 days
Cross sectional area of cylinder 1: 28.18 in^2
Cross sectional area of cylinder 2: 28.18 in^2
Compressive strength of cylinder 1: 4386.4 psi
Compressive strength of cylinder 2: 4370.1 psi
Compressive strength (to nearest 10 psi): 4380 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/9/2015 ✔