Summary for Test 2021-03-30-19-1
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 213598 DEA: 051F75U4 EFIS: 0518000092 |
|---|---|
| DIST-CO-RTE-PM | 05-MON-101-R36.9/47.7 |
| Award Date | 01/16/2019 |
| Closeout Date | 01/11/2024 |
| Work Description | CRCP, SEISMIC RETROFIT, BRIDGE WIDENING AND MEDIAN BARRIER |
| Location Description | MONTEREY COUNTY IN AND NEAR KING CITY FROM 0.4 MILE SOUTH OF WILD HORSE ROAD OVERCROSSING TO TEAGUE AVENUE |
| QA Service Level | 1 (Verified on 10/11/2018) |
Sample Information
| Sample Taken Date | 03/30/2021 | Sample Unique Key | 19 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/05/2021 | Sample type | Department Acceptance |
| A brief description of the sample | Asphalt Binder | The quantity of what the sample constitutes | 1 of 1 |
| From where was the sample collected | Other | First name of sampler or witnessed by | Granite |
| Last name of sampler or witnessed by | Tester | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Granite Coalinga HMA Plant | |
| Transportation Laboratory (TL) Number | c821198 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | Granite Coalinga HMA Plant | |
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | Not set |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2021-03-30-19
DIME Test ID: 2021-03-30-19-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-04-07
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Erika Gonzalez
Date of test: 04/06/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 173.883 grams
Mass of empty container #2: 172.801 grams
Mass of container #1 before test (m1i): 209.981 grams
Mass of container #2 before test (m2i): 209.411 grams
Mass of container #1 after test (m1f): 209.967 grams
Mass of container #2 after test (m2f): 209.394 grams
Average mass change: -0.043 percent
General comments (publicly viewable) (Max 1000 characters): per 2018 standard specifications
Test was verified on 4/7/2021 ✔
