Summary for Test 2021-03-18-17-3
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 213654 DEA: 060T20U4 EFIS: 0619000008 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-99-L0.0/11.2 |
| Award Date | 01/07/2019 |
| Closeout Date | 11/23/2021 |
| Work Description | REPLACE JPCP LANES WITH CONTINUOUSLY REINFORCED CONCRETE PAVEMENT. |
| Location Description | KERN COUNTY NEAR WHEELER RIDGE FROM 0.8 MILE SOUTH OF ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING |
| QA Service Level | 1 (Verified on 12/27/2018) |
Sample Information
| Sample Taken Date | 03/18/2021 | Sample Unique Key | 17 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 03/30/2021 | Sample type | Department Acceptance |
| A brief description of the sample | Asphalt Binder | The quantity of what the sample constitutes | 1 of 1 can |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | B. |
| Last name of sampler or witnessed by | Felder | Title of sampler | QA |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Tank at Plant | |
| Transportation Laboratory (TL) Number | C771407 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 70-10 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | Griffith | |
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | Not set |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2021-03-18-17
DIME Test ID: 2021-03-18-17-3
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-04-06
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Erika Gonzalez
Date of test: 04/05/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 167.997 grams
Mass of empty container #2: 167.717 grams
Mass of container #1 before test (m1i): 203.460 grams
Mass of container #2 before test (m2i): 203.134 grams
Mass of container #1 after test (m1f): 203.485 grams
Mass of container #2 after test (m2f): 203.158 grams
Average mass change: 0.069 percent
General comments (publicly viewable) (Max 1000 characters): Per 2018 standard specifications
Test was verified on 4/6/2021 ✔