Summary for Test 2021-03-19-2-9
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 215188 DEA: 080F5434 EFIS: 0817000239 Permit Numbers: 0823NMC0369 |
---|---|
DIST-CO-RTE-PM | 08-RIV-I-15,SR-91-6.1-7.6 |
Award Date | 03/11/2020 |
Closeout Date | 06/05/2024 |
Work Description | I-15 ELC: 15/91 Express Lanes Connector Project (ELC) |
Location Description | Junction of I-15 and SR-91 in Corona, CA |
QA Service Level | 1 (Verified on 09/16/2020) |
Sample Information
Sample Taken Date | 03/19/2021 | Sample Unique Key | 2 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/22/2021 |
Sample type | Verification | A brief description of the sample | JMF 3/4" HMA-A-SP R15, 0.5% LAS |
The quantity of what the sample constitutes | 3 Bags of Coldfeed Aggregate, 1 Bag of RAP | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | RJ Noble Corona | Last name of sampler or witnessed by | QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0166A-21 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | RJ Noble Company | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0014, 91-33-0039 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | 3/4 HMA-A-SP R15 | The fabricator/manufacturer designation for the sample | |
The plant number | 36R1501SPWC | A detailed description of where the material sample was collected | Belt Cut at RJ Noble Corona Plant |
Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2021-03-19-2
DIME Test ID: 2021-03-19-2-9
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-03-30
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Larry Diaz
Date of test: 03/24/2021
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 95 %
Cumulative percent passing the 3/8 in. sieve: 91 %
Cumulative percent passing the #4 sieve: 62 %
Cumulative percent passing the #8 sieve: 40 %
Cumulative percent passing the #16 sieve: 30 %
Cumulative percent passing the #30 sieve: 22 %
Cumulative percent passing the #50 sieve: 15 %
Cumulative percent passing the #100 sieve: 11 %
Cumulative percent passing the #200 sieve: 7 %
General comments (publicly viewable) (Max 1000 characters): RAP Gradation After Ignition Oven
Test was verified on 3/30/2021 ✔