Summary for Test 2021-03-18-5-9
Test performed: CTM 202-November 2011Project Information
| Project Identifiers | Project ID: 214821 DEA: 120H1504 EFIS: 1216000055 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-1-4.9/5.5,10.5/14.1 |
| Award Date | 09/11/2020 |
| Closeout Date | 07/03/2024 |
| Work Description | Cold plane AC, RHMA-G paving, and curb ramp reconstruction |
| Location Description | ORANGE COUNTY IN LAGUNA BEACH AND NEWPORT BEACH FROM 0.2 MILE SOUTH OF VISTA DEL SOL TO 7TH AVENUE AND FROM LEDROIT STREET TO NEWPORT COAST DRIVE |
| QA Service Level | 1 (Verified on 10/26/2020) |
Sample Information
| Sample Taken Date | 03/18/2021 | Sample Unique Key | 5 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/22/2021 |
| Sample type | Verification | A brief description of the sample | PSUE 3/4" WMA-A-SP R25, 0.25% EVO |
| The quantity of what the sample constitutes | 3 Bags of Coldfeed Aggegate | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | RJ Noble Orange | Last name of sampler or witnessed by | QC |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 0165A-21 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | RJ Noble Orange | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0035::EAGLE VALLEY QUARRY |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | 3/4 WMA-A-SP | The fabricator/manufacturer designation for the sample | |
| The plant number | 36R2508SPWEO | A detailed description of where the material sample was collected | Belt Cut at RJ Noble Orange Plant |
| Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2021-03-18-5
DIME Test ID: 2021-03-18-5-9
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-03-29
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Larry Diaz
Date of test: 03/26/2021
| Sieve Size | Cumulative Percent Passing | |||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 96 % | ||||||
| 88 % | ||||||
| 62 % | ||||||
| 43 % | ||||||
| 32 % | ||||||
| 23 % | ||||||
| 16 % | ||||||
| 11 % | ||||||
| 8 % | ||||||
General comments (publicly viewable) (Max 1000 characters): RAP Gradation After Ignition Oven
Test was verified on 3/29/2021 ✔
