Summary for Test 2021-01-19-12-3

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 214572
DEA: 034E62U4
EFIS: 0319000068
DIST-CO-RTE-PM03-ED-50-18.5/24.2
Award Date05/04/2020
Closeout DateNot set
Work DescriptionCONSTRUCT UC, MED BARRIER, DRAINAGE SYSTEMS & HMA OVERLAY.
Location DescriptionEL DORADO COUNTY IN AND NEAR PLACERVILLE FROM MOSQUITO ROAD UNDERCROSSING TO SCHNELL SCHOOL ROAD UNDERCROSSING AND FROM 0.2 MILE WEST OF STILL MEADOW ROAD TO 0.2 MILE EAST OF CARSON ROAD
QA Service Level1 (Verified on 03/18/2020)

Sample Information

Sample Taken Date01/19/2021 Sample Unique Key12
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/20/2021
Sample typeQuality Control A brief description of the sampleConcrete
The quantity of what the sample constitutes100 CY From where was the sample collectedJob Site
First name of sampler or witnessed byJarrad Last name of sampler or witnessed byMcCabe
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSyar Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberCT072CR5W
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected40143861
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedWB HWY 50 at Carson Court, Abutment 2 Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2021-01-19-12
DIME Test ID: 2021-01-19-12-3
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2021-04-03

Test Results


Input Type: Calculated
Tester's full name: Jarrad McCabe
Date of test: 01/19/2021
Air Content: 1.4 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/3/2021